TLDRThis video, set in an ATF1 16949 certified supplier company, depicts an audit process for verifying the quality management system in rivet manufacturing. The video outlines the procedure for receiving and verifying steel wire materials, with a specific example focusing on batch number 2083. The process involves visual inspection, tensile testing, and decarbonization testing in an internal lab. The auditor follows a set protocol, ensuring that materials meet the specified criteria and discusses the steps taken if the wire fails the test. The video highlights the importance of cross-referencing control plans and verifying the inspection and testing methods, lab personnel competence, and the calibration status of equipment used.

Takeaways

  • πŸ” Detailed inspection of steel wire batches before use.
  • πŸ”§ Importance of tensile and decarbonization tests.
  • πŸ“ Ensuring control plans match specification readings.
  • 🏭 Utilization of internal laboratories for quality verification.
  • πŸ“Š Following protocols when a material fails tests.
  • βš™οΈ Ensuring calibration status of testing equipment.
  • πŸ”¬ Use of specific chemical processes for decarbonization.
  • πŸ’Ό Communication and process in case of failures.
  • πŸ“ƒ Verifying certificates from suppliers.
  • πŸ”— Importance of supplier audits and monitoring.

Garis waktu

  • 00:00:00 - 00:05:00

    The video is filmed at an ATF1 16949 certified supplier involved in manufacturing rivets and designing equipment for rivet insertion. The focus is on an ATF1 16949 audit assessing the organization's quality management system. An auditor examines the process of receiving steel wire, Batch 2083, and verifies material quality. Each coil in a wire batch comes with a sample for testing in the lab. Samples are polished and tested for tensile strength and chemical analysis to match control plans. The video also shows verification steps for wire diameter and tensile tests. Failed tests result in notifying the person in charge, such as Steve Davenport.

  • 00:05:00 - 00:10:31

    The audit trail in the video includes the internal lab inspection, where six samples are verified to match the number of coils in a batch. The process for tensile testing based on coil quantity is explained. If a tensile test fails, a reaction plan is followed. The decarbonization test is verbally explained, focusing on image structures. The auditor checks inspection instructions and equipment calibration. Reliance on supplier-provided material property certificates is addressed, aligning with ATF 8.4.2 point1 requirements and supplier controls. Opportunities for further audit trails or supplier audits are highlighted.

Peta Pikiran

Mind Map

Video Tanya Jawab

  • What standards does the video focus on?

    The video focuses on the ATF1 16949 standards.

  • What materials are primarily discussed in the audit?

    The audit primarily discusses steel wire materials used in rivet manufacturing.

  • What kind of tests are highlighted in the video?

    The video highlights tensile testing and decarbonization testing.

  • Why is calibration verification mentioned?

    Verification of calibration is essential to ensure testing equipment provides accurate measurements.

  • How often do material failures occur according to the audit?

    Material failures do not occur very often according to the audit.

  • What happens if a material fails a test?

    If a material fails a test, it is flagged, further samples are tested, and it may be communicated to management.

  • What is the importance of the control plan in the audit?

    The control plan ensures that all testing aligns with specified requirements and quality benchmarks.

  • Does the laboratory rely on third-party analysis?

    Yes, the lab relies on supplier certificates for the chemical analysis of materials.

Lihat lebih banyak ringkasan video

Dapatkan akses instan ke ringkasan video YouTube gratis yang didukung oleh AI!
Teks
en
Gulir Otomatis:
  • 00:00:00
    [Music]
  • 00:00:09
    this series of videos has been filmed in
  • 00:00:11
    an atf1 16949 certified supplier who is
  • 00:00:14
    involved in the manufacture of a wide
  • 00:00:16
    range of rivets used for automotive and
  • 00:00:20
    non-automotive
  • 00:00:21
    applications they also design a
  • 00:00:23
    manufacture equipment used in Rivet
  • 00:00:26
    insertion the video shows extracts of
  • 00:00:30
    simulated atf1 16949 audits focus on the
  • 00:00:34
    organization's quality management system
  • 00:00:37
    processes watch this video and see if
  • 00:00:39
    the auditor is undertaking the audit
  • 00:00:42
    effectively as always we welcome
  • 00:00:45
    feedback and comments Dave I understand
  • 00:00:48
    that you can help me so I've just been
  • 00:00:50
    auditing the process of how you receive
  • 00:00:54
    uh the steel wire y um I've looked at
  • 00:00:57
    batch number 2083
  • 00:01:00
    and they pointed me in your direction to
  • 00:01:02
    talk about the
  • 00:01:03
    verification of the the material uh
  • 00:01:06
    quality that's fine so could you give me
  • 00:01:08
    an overall uh explanation first of what
  • 00:01:11
    you so an overall explanation straight
  • 00:01:12
    away is is this is all one delivery
  • 00:01:14
    that's come today um this morning um
  • 00:01:17
    it's wire batch 2077 which is already um
  • 00:01:20
    a wire batch that we have in stock and a
  • 00:01:22
    new wire batch today which is quite
  • 00:01:24
    handy for what we're doing here is 2083
  • 00:01:26
    this is the one that I saw out there
  • 00:01:28
    this the one there so basically what
  • 00:01:29
    what we do we they come wrapped in um
  • 00:01:32
    plastic we take the plastic off and on
  • 00:01:34
    attached to every coil is is a sample of
  • 00:01:37
    wire for that for that coil so we take
  • 00:01:39
    that off and bring it into the into the
  • 00:01:41
    lab here yeah um label it all up
  • 00:01:43
    ourselves and basically we just cut it
  • 00:01:45
    down and cut a small piece off and then
  • 00:01:47
    what we do then we cut a mount them on
  • 00:01:49
    the machine over there and we uh polish
  • 00:01:52
    them we grind them down first on the uh
  • 00:01:54
    piano discs which are 200 and 1,200 and
  • 00:01:58
    then onto the polishing pad over there
  • 00:01:59
    and then we decab them over on the
  • 00:02:01
    microscope over there right so that's
  • 00:02:03
    more the physical uh way of doing it
  • 00:02:06
    just explain why the six samples there's
  • 00:02:09
    there's six samples here because there's
  • 00:02:10
    six um coils in that um okay one sample
  • 00:02:15
    per coil yeah it's one sample per coil
  • 00:02:17
    so there was six coil batch um uh coil
  • 00:02:20
    coils sorry on that wire batch and on
  • 00:02:23
    this one here which is already an
  • 00:02:24
    existing watch which which is slightly
  • 00:02:25
    easier U because we don't have to do the
  • 00:02:28
    ttile on that but because this was a new
  • 00:02:30
    wire batch that we had in today we've
  • 00:02:31
    had to do a ten tile on it to test out
  • 00:02:34
    the mega pascals and and the strength of
  • 00:02:36
    of the uh of the wire uh which is passed
  • 00:02:38
    here cuz it needs to be between 540 and
  • 00:02:41
    590 megap pascals and it's pass today
  • 00:02:44
    matches yeah that matches the control
  • 00:02:46
    plan so let let's concentrate on the the
  • 00:02:48
    tensile strength first there okay so as
  • 00:02:51
    the control plan says 540 to
  • 00:02:54
    590 what was the actual reading the
  • 00:02:57
    actual reading for this today off coil 3
  • 00:02:59
    it is so it's wire batch 2083 the coil
  • 00:03:03
    number is
  • 00:03:04
    32718
  • 00:03:06
    sl3 um and we have to put in the wire
  • 00:03:08
    diameter which I I I measure all the
  • 00:03:10
    wire diameters before I go to make sure
  • 00:03:12
    that they're is spe um because the wire
  • 00:03:15
    diameter for this patch need to 5.5 to
  • 00:03:18
    5.55 which is all on the actual um CFC
  • 00:03:22
    yeah and again that matches a control
  • 00:03:24
    plan um which is got all of our chemical
  • 00:03:26
    analysis on here as well which is is
  • 00:03:29
    part of the heat treat number there so
  • 00:03:31
    we we just check it with the
  • 00:03:34
    specifications this this is provided by
  • 00:03:36
    the supplier this is supplied supplied
  • 00:03:38
    by the supplier yes so we just make sure
  • 00:03:40
    that it is the chemical analysis is
  • 00:03:42
    right we do all that before we go to um
  • 00:03:46
    do the tensile so we we have to put the
  • 00:03:48
    wire diameter in for the yeah excuse me
  • 00:03:51
    for the um tensile and is the yeah is
  • 00:03:55
    the T test done in here h no it's in
  • 00:03:58
    equipment oh okay so we'll we'll we'll
  • 00:04:01
    follow that in a minute yeah it's the
  • 00:04:02
    other side of Cu I want to verify the
  • 00:04:04
    calibration of that test so so basically
  • 00:04:07
    then what we do it's it's we work at a
  • 00:04:10
    10% um uh thing so so with this being
  • 00:04:13
    six coils we only need to do one so if
  • 00:04:16
    it's anything over 10 coils so say for
  • 00:04:19
    this one if this hadn't been this wire
  • 00:04:21
    batch 2077 with it being 11 coils that's
  • 00:04:25
    just out of the 10% so we'd have to do
  • 00:04:27
    two samples then and take them down to
  • 00:04:29
    10
  • 00:04:30
    yeah but with this only being a new
  • 00:04:31
    batch and being six we just had to do
  • 00:04:33
    one so this one passed today and it had
  • 00:04:35
    to be between sorry going back to 540 to
  • 00:04:38
    590 megap pascals and it's 547 so that's
  • 00:04:41
    that's great perfect and what action
  • 00:04:44
    would you take if it didn't pass and we
  • 00:04:46
    then we then would flag it up to Steve
  • 00:04:48
    Davenport who is um in charge of that so
  • 00:04:53
    yeah and
  • 00:04:54
    also basically send an email to everyone
  • 00:04:57
    everyone else and and that's sqa isn't
  • 00:04:59
    it Steve okay so we will follow that
  • 00:05:02
    witha does that happen very often uh no
  • 00:05:05
    no no not not very often again that
  • 00:05:07
    matches the records that I saw uh when I
  • 00:05:10
    it it does occasionally but but what we
  • 00:05:11
    do we take two samples down per coil so
  • 00:05:14
    if one fails we we test it again and if
  • 00:05:16
    they both fail that's when we flag it up
  • 00:05:18
    to speed and then it gets Blue Label
  • 00:05:20
    then yeah and just going back one step
  • 00:05:23
    you said is it the
  • 00:05:25
    decarbonization test you do what's the
  • 00:05:28
    acceptance criteria for that um it's
  • 00:05:30
    it's well it's on the wall here it's the
  • 00:05:31
    Martin site that we have there that we
  • 00:05:34
    have to have that um theing for that
  • 00:05:37
    that that that texture that that um and
  • 00:05:40
    that's done using the Microsoft yeah
  • 00:05:41
    that's done using the Microsoft so what
  • 00:05:43
    we do we we once we've taken it down the
  • 00:05:45
    grinder we've polished it and we've um
  • 00:05:49
    dipped it in acid it's it's a 5% nitric
  • 00:05:52
    acid mixed with methat Spirits um clean
  • 00:05:55
    it clean it with methyl Spirits dry it
  • 00:05:57
    out and check it on there and that would
  • 00:05:58
    show the grain structure the reason that
  • 00:06:01
    effectively yeah okay and again with
  • 00:06:04
    this batch how do we record the result
  • 00:06:08
    of that deiz basically yes so um there's
  • 00:06:12
    there's P for pass obviously f for fail
  • 00:06:14
    so this this at the moment is a work in
  • 00:06:16
    progress um by wbat 2083 the visuals
  • 00:06:20
    have all been fine so the visual is when
  • 00:06:23
    we get this wire back sample in here but
  • 00:06:25
    it's also when we take the plastic off
  • 00:06:27
    the off the wire in the warehouse to
  • 00:06:29
    make sure that the um that the wire is
  • 00:06:32
    isn't Rusty hasn't got any score marks
  • 00:06:34
    in it hasn't got any scuffs in it hasn't
  • 00:06:36
    been knocked by the you know by another
  • 00:06:38
    coil or or in transit at all so that's
  • 00:06:42
    that's all fine yeah that's fine so what
  • 00:06:43
    I'll do then is I will follow the audit
  • 00:06:46
    Trail through to the tensile tester um
  • 00:06:49
    and verify the calibration of that but
  • 00:06:51
    no your explanation was clear thank you
  • 00:06:53
    very much no problem in this video the
  • 00:06:56
    auditor is following an audit Trail to
  • 00:06:59
    verify the receiving inspection of the
  • 00:07:01
    wire that is used in the rivet
  • 00:07:03
    manufacturer process the checks are done
  • 00:07:07
    in the internal
  • 00:07:09
    laboratory this gives the opportunity to
  • 00:07:12
    verify the internal laboratory scope the
  • 00:07:15
    inspection and the test methods and the
  • 00:07:18
    competency of the laboratory
  • 00:07:20
    Personnel the good thing is that the
  • 00:07:23
    auditor ask the audit to give an
  • 00:07:25
    overview at the process at the beginning
  • 00:07:28
    the audit explained that there are six
  • 00:07:31
    samples that are verified in this case
  • 00:07:35
    matching the number of coils within the
  • 00:07:37
    batch the auditor also made good use of
  • 00:07:41
    the control plan during this part of the
  • 00:07:44
    audit the audit here explained that for
  • 00:07:47
    the tensile test the number of coils
  • 00:07:50
    checked depends on how many coils in the
  • 00:07:53
    backat he explained that if there are
  • 00:07:55
    less than 10 coils only one coil is
  • 00:07:59
    check
  • 00:08:00
    but if there are more than 10 for
  • 00:08:02
    example between 10 and 20 two samples
  • 00:08:06
    are taken the auditor asks what happens
  • 00:08:09
    if a coil fails the tensile test
  • 00:08:13
    although the auditor answered this
  • 00:08:16
    verbally there is also the opportunity
  • 00:08:19
    to verify the reaction plan that should
  • 00:08:21
    be defined within the control plan the
  • 00:08:25
    auditor establish that the tensile test
  • 00:08:28
    is done in another area within the
  • 00:08:31
    organization and he stated that he would
  • 00:08:33
    follow the audit Trail to this later in
  • 00:08:36
    the audit to verify the calibration
  • 00:08:39
    status of the
  • 00:08:41
    equipment the audit then moved on to the
  • 00:08:44
    decarbonization test which the audite
  • 00:08:47
    explained
  • 00:08:48
    verbally here there would have been the
  • 00:08:50
    opportunity to look at the inspection
  • 00:08:53
    and test work
  • 00:08:55
    instruction also it was not clear
  • 00:08:58
    whether the test was an attribute test
  • 00:09:01
    or a variable test that was undertaken
  • 00:09:04
    using the microscope in either case the
  • 00:09:07
    auditor should verify the acceptance
  • 00:09:10
    criteria the calibration of the
  • 00:09:12
    microscope and the measurement of system
  • 00:09:15
    analysis for this type of
  • 00:09:19
    equipment it was also evidence from the
  • 00:09:22
    audit that the organization relies on
  • 00:09:24
    the supplier certificate of the analysis
  • 00:09:28
    of many of the Mater material properties
  • 00:09:31
    in this case this would relate to ATF
  • 00:09:34
    requirement
  • 00:09:35
    8.4.2 point1 type and extent of control
  • 00:09:41
    and this requirement has been
  • 00:09:42
    supplemented by sanctioned
  • 00:09:44
    interpretation 7 which added the
  • 00:09:48
    requirement where characteristics or
  • 00:09:51
    components pass through the
  • 00:09:53
    organization's quality management system
  • 00:09:56
    without validation and control the
  • 00:09:59
    organization shall ensure that the
  • 00:10:01
    appropriate controls are in place at the
  • 00:10:04
    point of
  • 00:10:05
    manufacturer this gives the opportunity
  • 00:10:08
    for the auditor to follow the audit
  • 00:10:10
    trail to the supplier
  • 00:10:12
    selection any supplier monitoring that
  • 00:10:15
    is done and any supplier audits that
  • 00:10:18
    have been undertaken to verify the
  • 00:10:20
    controls related to the pass through
  • 00:10:23
    characteristics are been managed
  • 00:10:25
    effectively
  • 00:10:26
    [Music]
Tags
  • ATF1 16949
  • audit process
  • rivet manufacturing
  • quality assurance
  • tensile test
  • decarbonization test
  • control plan
  • supplier management
  • inspection methods
  • calibration