Pengujian Tahanan isolasi Transformator

00:06:42
https://www.youtube.com/watch?v=_T_VB6NWYHE

Resumen

TLDRThe video showcases a practical session in an electrical distribution laboratory focusing on transformer testing. It begins with safety measures, including shutting down the transformer and ensuring proper ventilation. The temperature of the transformer is measured using a thermovision device, ensuring it is cool enough for testing. The insulation resistance test is performed using an insulation tester set to 5,000 volts, with safety gloves worn during the process. The video details the setup, execution, and results of the tests, concluding with the proper closure of the testing area.

Para llevar

  • 🔌 Transformer testing is crucial for safety.
  • 🌡️ Temperature must be measured before testing.
  • 🧤 Always wear safety gloves during tests.
  • ⚡ Insulation testers inject high voltage for measurements.
  • ⏳ Tests are typically conducted for 10 minutes.
  • 📊 Results vary and should be recorded accurately.
  • 🚪 Proper ventilation is important during testing.
  • 🔒 Ensure all equipment is secured after use.
  • 🔧 Follow safety protocols to prevent accidents.
  • 📅 Regular testing is essential for transformer maintenance.

Cronología

  • 00:00:00 - 00:06:42

    The video begins with an introduction to the laboratory focused on the distribution and utilization of electrical energy, specifically detailing the practical module on transformer testing. The process starts with shutting down the transformer and opening all doors for ventilation to release heat. The temperature of the room and transformer is measured using a thermovision device, showing a temperature of 42.0 degrees Celsius. Once the temperature is deemed cool enough, insulation resistance testing is conducted using an insulation tester that injects a voltage of 5,000 volts. The setup involves connecting the tester's probes to the transformer, ensuring safety with 20 kV gloves. The tester is set to 5,000 volts for a duration of 10 minutes, with results recorded at 1.20 and 1.03 during different tests. After completing the insulation resistance measurements, the equipment is turned off, and the area is cleaned up. The session concludes with a summary of the practical work done, emphasizing the importance of safety and proper procedure in electrical testing.

Mapa mental

Vídeo de preguntas y respuestas

  • What is the purpose of the insulation resistance test?

    The insulation resistance test is conducted to ensure the safety and reliability of the transformer by measuring its insulation resistance.

  • What equipment is used for the insulation resistance test?

    An insulation tester is used to inject a voltage of 5,000 volts into the transformer for testing.

  • What safety precautions are taken during the testing?

    Safety gloves rated for 20 kV are worn to protect against electrical hazards.

  • How long is the insulation resistance test conducted?

    The test is conducted for a duration of 10 minutes.

  • What were the results of the insulation resistance tests?

    The results varied, with readings of 1.20, 1.03, and 1.24 recorded during different tests.

Ver más resúmenes de vídeos

Obtén acceso instantáneo a resúmenes gratuitos de vídeos de YouTube gracias a la IA.
Subtítulos
id
Desplazamiento automático:
  • 00:00:00
    selamat datang di laboratorium
  • 00:00:01
    distribusi dan pemanfaatan tenaga
  • 00:00:02
    listrik pada kesempatan kali ini kita
  • 00:00:05
    akan melakukan praktikum modul 6 yakni
  • 00:00:08
    pengujian transformator di sini kita
  • 00:00:11
    sudah ada di garduduk kiosnya kemudian
  • 00:00:15
    sebelum kita melakukan pengujian tahanan
  • 00:00:18
    isolasi pada transformator kita
  • 00:00:21
    melakukan pemadaman kemudian setelah
  • 00:00:22
    melakukan pemadaman kita membuka
  • 00:00:25
    setiap pintu dari gardunya
  • 00:00:31
    di mana fungsi untuk kita membuka pintu
  • 00:00:33
    ini sebagai
  • 00:00:34
    ventilasi agar panas yang terdapat dalam
  • 00:00:37
    traavo itu terbuang atau keluar sudah
  • 00:00:40
    membuka semua gerbang semua pintu yang
  • 00:00:42
    ada dalam kios ini kita mengukur suhu
  • 00:00:45
    ruang serta travonya menggunakan
  • 00:00:47
    thermovision di mana thermoision ini
  • 00:00:49
    merupakan alat ukur yang yang berfungsi
  • 00:00:51
    untuk mengukur suhu ruang dan suhu alat
  • 00:00:59
    di sini terlihat
  • 00:01:01
    suhunya 4
  • 00:01:03
    42,0
  • 00:01:06
    Celcius kemudian setelah dilihat suhu
  • 00:01:09
    dari ruang serta travoya sudah cukup
  • 00:01:11
    dingin kita baru dapat melakukan
  • 00:01:14
    pengujian tahanan isolasi
  • 00:01:17
    di mana pada pengujian tahanan
  • 00:01:19
    isolasi kita
  • 00:01:26
    menggunakan isolation
  • 00:01:28
    tester di mana ini alat alat ini
  • 00:01:32
    berfungsi untuk menginject tegangan
  • 00:01:34
    sebesar 5.000 di sini terdapat
  • 00:01:37
    insulation tester di mana berfungsi
  • 00:01:39
    untuk menginject tegangan ke traavo di
  • 00:01:42
    sini kita mulai merakit insulation
  • 00:01:44
    testernya yang pertama kita
  • 00:01:47
    menghubungkan Profah ke line soket line
  • 00:01:51
    kemudian kita menghubungkan Prof hitam
  • 00:01:53
    di soket Earth kemudian setelah kita
  • 00:01:56
    melakukan merangkai dari majornya kita
  • 00:01:59
    memakai sarung tangan safety 20 kV di
  • 00:02:02
    mana sarung tangan ini berfungsi untuk
  • 00:02:04
    pengaman dari
  • 00:02:14
    pengujian kemudian setelah kita memakai
  • 00:02:16
    sarun tangan safety 20 kVt kita mulai
  • 00:02:19
    menghubungkan prop-prop dari majornya di
  • 00:02:22
    mana prop hitam ini dihubungkan ke body
  • 00:02:25
    dari transformatornya atau travonya kita
  • 00:02:28
    cari body yang kondisinya dia sudah
  • 00:02:32
    bertemu besi tidak bertemu cat agar
  • 00:02:35
    hasilnya lebih akurat akurat akurat
  • 00:02:39
    untuk Prof kita hubungkan ke TM
  • 00:02:45
    setelah itu di sini pada
  • 00:02:51
    majornya kita setting di 5000 volt atau
  • 00:02:55
    settingan maksimal di mana pada travo
  • 00:02:58
    ini dia
  • 00:03:01
    memiliki tegangan kerja tegangan kerja
  • 00:03:04
    yakni 20 kVt atau 20.000 1000 volt
  • 00:03:09
    tetapi major yang kita punya ini hanya
  • 00:03:11
    5.000 volt kemudian di sini kita mulai
  • 00:03:14
    mengaktifkannya dietting ke
  • 00:03:22
    5.000 setelah itu kita
  • 00:03:28
    mulai time set dietting ke 10 menit
  • 00:03:32
    kemudian kita
  • 00:03:34
    mulai memutar selektornya yang berwarna
  • 00:03:39
    oren
  • 00:03:48
    kelok sampai 10 menit
  • 00:04:07
    kemudian di sini terlihat hasilnya yakni
  • 00:04:13
    1,20 kemudian setelah itu kita matikan
  • 00:04:16
    dulu alatnya ini loknya
  • 00:04:18
    dilepas kemudian di-off-kan
  • 00:04:22
    duluan setelah itu sama dengan hal yang
  • 00:04:25
    tadi kita kita on-kan dulu ke
  • 00:04:29
    5.000 setelah 5.000 kita set time dulu
  • 00:04:32
    sampai
  • 00:04:34
    10 menit kemudian kita lock
  • 00:04:56
    kemudian hasil yang didapat adalah
  • 00:04:59
    1,03 setelah kita melakukan
  • 00:05:02
    pengukuran TR kita mematikan dulu
  • 00:05:06
    insulation testernya di mana locknya
  • 00:05:09
    kita lepas lalu kita off-kan
  • 00:05:14
    kemudian setelah kita melakukan
  • 00:05:16
    pengukuran TR kita melakukan pengukuran
  • 00:05:18
    TR dan TM di
  • 00:05:20
    mana Prof hitam dihubungkan ke
  • 00:05:25
    TM setelah itu kita mulai menghidupkan
  • 00:05:30
    kembali insulation testernya kita ubah
  • 00:05:33
    ke 5000
  • 00:05:36
    volt kemudian time setnya diubah ke 10
  • 00:05:39
    menit kemudian kita lock
  • 00:05:47
    kita tunggu 10
  • 00:05:56
    menit kemudian setelah 10 menit kita
  • 00:06:00
    lihat di sini hasil yang didapat adalah
  • 00:06:03
    1,24 setelah kita mendapatkan hasil kita
  • 00:06:06
    buka dulu locknya untuk mematikan lalu
  • 00:06:08
    kita offkan
  • 00:06:11
    setelah itu kita membereskan alat dan
  • 00:06:14
    perlengkapannya setelah kita melakukan
  • 00:06:16
    pengujian tahanan isolasi pada travot
  • 00:06:18
    kita menutup gardunya kembali
  • 00:06:23
    seperti mungkin cukup sekian
  • 00:06:28
    praktikum instalasi distribusi tenaga
  • 00:06:30
    listrik modul pengujian tahanan isolasi
  • 00:06:33
    pada transformator saya selaku asisten
  • 00:06:36
    yang bertugas kali ini kurang lebihnya
  • 00:06:38
    mohon maaf wasalamualaikum
  • 00:06:39
    warahmatullahi wabarakatuh
Etiquetas
  • transformer testing
  • insulation resistance
  • electrical safety
  • thermovision
  • insulation tester
  • laboratory practices
  • temperature measurement
  • safety precautions
  • electrical distribution
  • practical session