New Rack - Step By Step Installation

00:26:03
https://www.youtube.com/watch?v=-y02T1Vt0RU

Résumé

TLDRIn this episode, the creator organizes a messy home tech setup into a tidy installation. The process involves using floor cable channels, cable ties, and terminating cables with Panduit mini-com modules. Additionally, the video showcases how to mount equipment in a rack cabinet, manage and label cables effectively, and ensure proper power distribution using surge protectors and ups. The final setup connects various network components, ensuring functionality and organization for better performance.

A retenir

  • 🧹 Clear the workspace before starting the installation.
  • 📦 Use floor cable channels for better organization.
  • ✂️ Use cable ties to bundle and secure cables.
  • 🔌 Utilize Panduit mini-com modules for cable termination.
  • 🏷️ Label your patch panel for easy identification.
  • ⚡ Implement surge protectors for device safety.
  • 🔋 Use a UPS for battery backup during power outages.
  • 🗄️ Mount equipment carefully within the rack for airflow.
  • 📊 Connect all components properly for efficient network performance.
  • ✨ Take pride in a neat and functional tech setup.

Chronologie

  • 00:00:00 - 00:05:00

    The video showcases a tech installation at a friend's home, highlighting the clutter and planning to transform it into a tidy setup. The host initiates the cleaning process by using a floor cable channel for organization and implements cable ties to maintain order.

  • 00:05:00 - 00:10:00

    The cables are prepped for installation by stripping, trimming, and terminating them using Panduit's mini-com modules. The preparation includes careful organization of wire pairs and secure connections, followed by the assembly of a network component cabinet.

  • 00:10:00 - 00:15:00

    The rack cabinet receives various components including a patch panel, which is installed to manage incoming cables and prevent dust intrusion. The cables are threaded through designated openings, preparing the setup for further labeling and organization.

  • 00:15:00 - 00:20:00

    Labeling the patch panel ensures clarity in identifying connections, using a label manager to create concise labels for each module. The labels are affixed to the panel, and the modules are mounted securely, enhancing both function and aesthetics.

  • 00:20:00 - 00:26:03

    Finalizing the installation involves connecting all devices, including switches and routers, to their respective ports while incorporating protective elements like a surge protector and UPS. The conclusion emphasizes the satisfaction of achieving a neat and functional tech space.

Afficher plus

Carte mentale

Vidéo Q&R

  • What tools are needed for the installation?

    Tools required include cable ties, a cable stripper, a label maker, and rack mounting hardware.

  • How do I terminate cables using mini-com modules?

    You need to insert wires into the correct channels according to color coding and secure them using a termination tool.

  • What is the purpose of a UPS?

    A UPS provides battery backup during power failures or voltage drops.

  • How do I label the patch panel?

    Use a label manager to create short labels for each jack module.

  • What is a surge protector?

    A surge protector helps protect devices from voltage spikes.

  • How do I connect the modem and network switches?

    Connect the modem's DSL port to the patch panel, then connect the patch panel ports to the switch.

  • Why is cable management important?

    Proper cable management helps maintain organization and prevents damage to cables.

  • What is the benefit of using a cable manager?

    A cable manager helps keep cables tidy and secured in a professional manner.

Voir plus de résumés vidéo

Accédez instantanément à des résumés vidéo gratuits sur YouTube grâce à l'IA !
Sous-titres
en
Défilement automatique:
  • 00:00:00
    hello and welcome to Poseidon tech this
  • 00:00:03
    is one of my friends home
  • 00:00:06
    he likes old tech stuff and he's always
  • 00:00:09
    adding new things but as you can see he
  • 00:00:14
    never has time to tidy things up so I
  • 00:00:17
    decided to help him and turn this mess
  • 00:00:20
    installation into this neat installation
  • 00:00:41
    [Music]
  • 00:01:01
    so in today's episode I will show you
  • 00:01:04
    how to make an installation like this
  • 00:01:07
    first allow me to clear this mess
  • 00:01:32
    that's look nicer so let's start use a
  • 00:01:38
    floor cable channel for the cables
  • 00:01:50
    peel off the adhesive tape backing
  • 00:01:57
    [Music]
  • 00:02:08
    [Music]
  • 00:02:11
    presents an old fear me to the floor
  • 00:02:15
    [Music]
  • 00:02:26
    lay the cables into the channel i will
  • 00:02:30
    use cable ties to ensure that cables
  • 00:02:32
    will stay in place
  • 00:02:40
    [Music]
  • 00:02:58
    [Music]
  • 00:03:03
    snap the lead shot
  • 00:03:06
    [Music]
  • 00:03:16
    apply even pressure along the entire
  • 00:03:18
    length
  • 00:03:23
    [Music]
  • 00:03:31
    now bundle the cables all together and
  • 00:03:34
    put cable ties
  • 00:03:37
    [Music]
  • 00:04:12
    cut the edges of the cable ties using a
  • 00:04:15
    flask a trimmer
  • 00:04:26
    [Music]
  • 00:04:31
    dream the cables in order to be on the
  • 00:04:33
    same length
  • 00:04:52
    [Music]
  • 00:04:58
    remove the cable socket using a cable
  • 00:05:01
    stripper
  • 00:05:21
    remove the separator with a flask a
  • 00:05:23
    dreamer
  • 00:05:35
    likewise do the same for the rest of the
  • 00:05:38
    cables
  • 00:05:42
    [Music]
  • 00:05:52
    all the cables are ready now
  • 00:05:59
    I will terminate the cables using
  • 00:06:01
    Pandits mini-cons AK modules
  • 00:06:16
    [Music]
  • 00:06:25
    [Music]
  • 00:06:40
    this is the mini comb Zack module
  • 00:06:43
    [Music]
  • 00:06:51
    it has two parts the wire cap and the
  • 00:06:55
    module housing for more information on
  • 00:06:58
    how to terminate a Pat's panel using bad
  • 00:07:00
    weeds sack modules please watch my step
  • 00:07:02
    by step tutorial I will use connection
  • 00:07:05
    type B so in the front side of the white
  • 00:07:09
    cap instead of brown and green pair and
  • 00:07:11
    in the backside blue and orange pair
  • 00:07:17
    secure the cable by pressing the clip
  • 00:07:19
    using Pandits termination tool and twist
  • 00:07:23
    a little bit the pair's and using the
  • 00:07:25
    separator of the wire cap insert the
  • 00:07:27
    wire into the correct channel according
  • 00:07:29
    to its color cut the edges using a flask
  • 00:07:39
    a dreamer
  • 00:07:53
    push the module housing using the
  • 00:07:56
    termination told
  • 00:08:03
    likewise terminate all cables my jack
  • 00:08:13
    modules bouquet is ready I will use this
  • 00:08:17
    floor-standing Iraq cabinet for mounting
  • 00:08:19
    all Network components
  • 00:08:31
    I will use this putz panel from
  • 00:08:33
    bandwidth to mount exact modules inside
  • 00:08:37
    the box you will find a rack screws
  • 00:08:50
    Zach modules removing torn
  • 00:09:02
    and bandwidth mini-com 24-port spots
  • 00:09:05
    panel i will also use this cable manager
  • 00:09:10
    from bandwidth
  • 00:09:27
    [Music]
  • 00:09:38
    [Music]
  • 00:09:45
    [Music]
  • 00:09:55
    open the cables opening of the rack
  • 00:09:57
    cabinet
  • 00:10:01
    [Music]
  • 00:10:10
    [Music]
  • 00:10:21
    this is a pass-through panel for cables
  • 00:10:28
    so let's mount it on the cable opening
  • 00:10:31
    to prevent dust from entering inside the
  • 00:10:33
    rack
  • 00:10:36
    [Music]
  • 00:10:39
    insert the cables inside the rack
  • 00:10:45
    [Music]
  • 00:10:53
    [Music]
  • 00:11:00
    [Music]
  • 00:11:05
    now it's time to label the pats panel
  • 00:11:11
    [Music]
  • 00:11:14
    I will use this label manager 1 6 0 from
  • 00:11:19
    diamond I will also need the six
  • 00:11:23
    millimeters label cassette insert the
  • 00:11:29
    cassette into the back of the label
  • 00:11:31
    manager
  • 00:11:40
    and turn it on select six millimeters
  • 00:11:47
    create your label
  • 00:11:56
    [Music]
  • 00:12:02
    this is the label for the Internet
  • 00:12:04
    service provider Jack module likewise
  • 00:12:09
    create all the necessary labels for this
  • 00:12:12
    patch panel I recommend you to use font
  • 00:12:14
    size 10 and maximum 6 characters
  • 00:12:23
    [Music]
  • 00:12:25
    these are all my labels
  • 00:12:37
    I must dream them in order to fit on the
  • 00:12:40
    pads panel
  • 00:13:02
    remove the sticker cover sticker the
  • 00:13:07
    labels on the patch panel
  • 00:13:12
    [Music]
  • 00:13:13
    I believe that it looks great
  • 00:13:23
    [Music]
  • 00:13:30
    [Music]
  • 00:13:32
    mount the jack models into the pads
  • 00:13:34
    panel
  • 00:13:46
    [Music]
  • 00:13:55
    [Music]
  • 00:14:01
    tidy up the cables using cable ties
  • 00:14:14
    [Music]
  • 00:14:29
    this is a rackmount kids not this is a
  • 00:14:33
    rack screw with a plastic water
  • 00:14:38
    [Music]
  • 00:14:41
    but that's one of the wings of the kids
  • 00:14:44
    not behind of the recurrence mounting
  • 00:14:46
    hole press decades not to attacks in the
  • 00:14:49
    other wing
  • 00:14:50
    likewise attacks in the other kids nuts
  • 00:14:53
    [Music]
  • 00:15:07
    for this pots panel you will need four
  • 00:15:09
    kids nuts now secure the Pats panel
  • 00:15:19
    using the rack screws
  • 00:15:41
    [Music]
  • 00:16:06
    a thousand decades nuts from the cable
  • 00:16:09
    manager
  • 00:16:09
    [Music]
  • 00:16:26
    mount the cable manager
  • 00:16:57
    [Music]
  • 00:16:59
    attach the kids nuts for the unified
  • 00:17:01
    Suites
  • 00:17:08
    [Music]
  • 00:17:15
    [Music]
  • 00:17:19
    mount the unified Suites
  • 00:17:31
    [Music]
  • 00:17:40
    [Music]
  • 00:17:59
    [Music]
  • 00:18:15
    [Music]
  • 00:18:18
    Connect Pat's panel sports with the
  • 00:18:20
    ports of the Suites using passwords
  • 00:18:23
    [Music]
  • 00:18:30
    [Music]
  • 00:18:37
    [Music]
  • 00:19:20
    connect the telephone cable for the ISPs
  • 00:19:23
    modem
  • 00:19:26
    [Music]
  • 00:19:36
    and also the telephone cable for the
  • 00:19:40
    analog telephones
  • 00:19:49
    finally connect the pad score that will
  • 00:19:51
    connect the Suites with the router
  • 00:19:54
    [Music]
  • 00:20:03
    now you can close the cable manager
  • 00:20:05
    using its plastic cover
  • 00:20:17
    attach decades nuts for the rack self
  • 00:20:32
    this is a fixed self in order to support
  • 00:20:35
    the modem of the ISP and the router but
  • 00:20:38
    cannot be mounted directly into the rack
  • 00:20:42
    [Music]
  • 00:20:53
    [Music]
  • 00:21:01
    [Music]
  • 00:21:04
    I will use the surge protector with five
  • 00:21:06
    outlets from Schneider in order to
  • 00:21:09
    protect the devices from lightning
  • 00:21:11
    strikes or over voltage
  • 00:21:16
    [Music]
  • 00:21:17
    I will use also ups that provides
  • 00:21:20
    battery backup when the electrical power
  • 00:21:22
    fails or drops to in an acceptable
  • 00:21:25
    voltage level plug the power cord of the
  • 00:21:30
    surge protector into the UPS outlet turn
  • 00:21:36
    on the UPS tidy up the cables
  • 00:21:44
    [Music]
  • 00:22:01
    [Music]
  • 00:22:09
    this power cord is from the Swedes so
  • 00:22:11
    plug it into the surge protectors outlet
  • 00:22:15
    [Music]
  • 00:22:22
    [Music]
  • 00:22:32
    this power cord is from the unified rim
  • 00:22:35
    machine
  • 00:22:52
    plug it also into an outlet this is the
  • 00:22:59
    power supply of the ISPs modem like it
  • 00:23:02
    also into an outlet
  • 00:23:11
    [Music]
  • 00:23:15
    this is the modem of the internet
  • 00:23:16
    service provider
  • 00:23:20
    connect the isp port of the paths panel
  • 00:23:22
    with the DSL port of the modem and the
  • 00:23:28
    telephone port will phone one or phone
  • 00:23:31
    to of the modem
  • 00:23:38
    [Music]
  • 00:23:56
    connect also the power cord into modems
  • 00:23:59
    power port this is the unified dream
  • 00:24:12
    machine from obesity connect the power
  • 00:24:17
    cord into the power port of the dream
  • 00:24:19
    machine connect the one port with modems
  • 00:24:28
    LAN port using a patch cord
  • 00:24:31
    [Music]
  • 00:24:38
    [Music]
  • 00:24:46
    [Music]
  • 00:24:52
    finally connect dream machines Lamport
  • 00:24:55
    with the unified switch
  • 00:25:01
    [Music]
  • 00:25:10
    [Music]
  • 00:25:12
    it's time to turn everything on
  • 00:25:16
    [Music]
  • 00:25:24
    [Music]
  • 00:25:29
    so this was the complete installation if
  • 00:25:33
    you like my tutorials consider
  • 00:25:34
    subscribing to my channel thank you so
  • 00:25:37
    much for watching see you in the next
  • 00:25:39
    episode
  • 00:25:46
    [Music]
  • 00:25:53
    [Music]
  • 00:26:00
    [Music]
Tags
  • network installation
  • cable management
  • panduit modules
  • home tech
  • surge protector
  • UPS
  • labeling
  • cable ties
  • rack mount
  • DIY tech setup