How to become a sparky in Australia | ONSITE CHAT

00:11:15
https://www.youtube.com/watch?v=IKWmevB8D-c

الملخص

TLDRIn this video, the team from mwatts is engaged in an electrical installation project in Abbotsford, focusing on rewiring and installing a new meter panel and consumer mains. They discuss the process of unpacking and pre-wiring the meter panel, ensuring compliance with current regulations, and the importance of being present on-site for effective communication and oversight. The video also highlights the experiences of apprentices in the field, emphasizing the significance of maintaining an organized workspace and the journey of finding apprenticeships through social media. The project aims to enhance the safety and functionality of the electrical system, with a focus on proper installation techniques and adherence to safety standards.

الوجبات الجاهزة

  • 🔌 New meter panel installation underway.
  • ⚡ Compliance with current electrical regulations is crucial.
  • 👷‍♂️ Being on-site enhances communication and oversight.
  • 🛠️ Old meter panel replaced for safety reasons.
  • 🌍 Apprentices find opportunities through social media.
  • 📦 Pre-wiring the meter panel for efficiency.
  • 🔧 Importance of organized workspace during installations.
  • 💡 80 amp fuse serves as a safety measure.
  • 🌡️ Heated towel rail installation included in the project.
  • 📅 Project aims for a safe and functional electrical system.

الجدول الزمني

  • 00:00:00 - 00:05:00

    The team is preparing for an electrical installation, focusing on unpacking the meter panel and pre-wiring. They discuss the necessary connections and materials needed for the new mains and earth system, emphasizing the importance of safety checks due to previous issues with cracked outlets and switches. The installation process is described as straightforward compared to previous projects, with access to run cables in the roof space, and they plan to finish with protective coatings to prevent corrosion.

  • 00:05:00 - 00:11:15

    The team continues with the installation, discussing the overhead fuse box and the new hinged meter panel that complies with current regulations. They are replacing the old meter panel and ensuring that all rewiring meets safety standards. The narrative shifts to the apprentices, highlighting their journey and experiences in the trade, emphasizing the importance of organization and efficiency on the job site. The camaraderie among the team is evident as they work together to complete the project.

الخريطة الذهنية

فيديو أسئلة وأجوبة

  • What is being installed in the video?

    A new meter panel, consumer mains, and a heated towel rail.

  • Why is the old meter panel being replaced?

    It does not meet current regulations and needs to be a hinged panel.

  • What is the importance of being on-site during the installation?

    It allows for better communication, oversight, and relationship building with clients.

  • What type of cable is being used for the main earth?

    6 mil main earth cable.

  • How does the team ensure safety during the rewiring process?

    By conducting electrical safety checks and adhering to current regulations.

  • What is the role of the power distributor team?

    They disconnect the overhead supply to allow safe installation.

  • What is the significance of the 80 amp fuse mentioned?

    It serves as the first point of protection for the electrical system.

  • How do apprentices find their opportunities in the field?

    Through platforms like Instagram and direct outreach to companies.

  • What is the purpose of the heated towel rail?

    To provide warmth and drying for towels in bathrooms.

  • What is the expected outcome of the installation?

    A safe and compliant electrical system with improved functionality.

عرض المزيد من ملخصات الفيديو

احصل على وصول فوري إلى ملخصات فيديو YouTube المجانية المدعومة بالذكاء الاصطناعي!
الترجمات
en
التمرير التلقائي:
  • 00:00:00
    [Music]
  • 00:00:13
    wide new main Earth from the switch
  • 00:00:15
    board down to there that just needs to
  • 00:00:18
    be G
  • 00:00:20
    sprayed the new Mains are sitting there
  • 00:00:22
    ready for connection the United energy
  • 00:00:24
    dude's coming out
  • 00:00:26
    now so what we can do here
  • 00:00:30
    is probably unpack the meter
  • 00:00:33
    panel and do like a bit of pre-wiring
  • 00:00:36
    inside it grab that out unpack it we're
  • 00:00:39
    going to start the oh we'll just wait
  • 00:00:41
    till he gets here to strip his out
  • 00:00:43
    yeah yeah this is going to have to go
  • 00:00:45
    round the
  • 00:00:47
    panel so this can get 20 mil Cy put on
  • 00:00:53
    it into here connect
  • 00:00:56
    it this is going to go and we'll have
  • 00:00:59
    like 200
  • 00:01:03
    mil actually we'll butt up the panel to
  • 00:01:08
    that bottom of the panel on
  • 00:01:10
    that and then whatever Cory's needed 32
  • 00:01:14
    mil from there down to the panel with a
  • 00:01:17
    32 mil gland in the top I don't know if
  • 00:01:19
    we have
  • 00:01:20
    that or probably get away with 25 mil
  • 00:01:24
    yeah you get 25 on that yeah that that
  • 00:01:27
    we need to see if we got a white texture
  • 00:01:29
    can we see if we got that
  • 00:01:32
    what text
  • 00:01:33
    that might have to get oh yeah
  • 00:01:40
    or take it through the panel take it
  • 00:01:43
    through the panel and when it's inside
  • 00:01:44
    the panel we'll need to cover it in 20
  • 00:01:46
    mil cry inside the panel and it'll pop
  • 00:01:49
    out the bottom and go straight to
  • 00:01:51
    that so that can all go inside 32 mil if
  • 00:01:55
    you have it the mains of this old um
  • 00:01:58
    Style and so we did um an electrical
  • 00:02:02
    safety check here and it revealed a
  • 00:02:04
    bunch of like cracked outlets and
  • 00:02:05
    switches inside lights change them but
  • 00:02:09
    also would rewiring the mains which
  • 00:02:12
    means switchboard staying as it is new
  • 00:02:14
    meter panel new consumer Mains which is
  • 00:02:17
    these bad boys new main Earth and then
  • 00:02:21
    the overhead fuse box is going to stay
  • 00:02:23
    where it is but the the the power
  • 00:02:26
    distributor truck appointment dude's
  • 00:02:28
    going to come here soon to disconnect
  • 00:02:29
    that for
  • 00:02:31
    us and then
  • 00:02:33
    uh truck appoint the actual truck
  • 00:02:36
    appointment is 1:30 p.m. the saavi the
  • 00:02:38
    inspector Angelo is coming here at like
  • 00:02:42
    130 but compared to that other Mains
  • 00:02:45
    rewire we did in our last video that was
  • 00:02:47
    like quite tricky this one's much more
  • 00:02:50
    straightforward cuz that's staying in
  • 00:02:51
    the same spot that's staying in the same
  • 00:02:52
    spot we've got access to run the cables
  • 00:02:54
    inside the roof space it's just a lot
  • 00:02:57
    more
  • 00:02:58
    uh ease of installations
  • 00:03:02
    much
  • 00:03:04
    lower or higher so we're also rewiring 6
  • 00:03:08
    mil main Earth through the roof
  • 00:03:13
    space down to here via 20 mil
  • 00:03:17
    conju and uh
  • 00:03:20
    onto a main Earth electrode which goes
  • 00:03:23
    into the ground and Earths the whole
  • 00:03:25
    installation this is all finished
  • 00:03:28
    here we just need
  • 00:03:31
    to spray it with gal
  • 00:03:38
    spray this uh stops it from
  • 00:03:42
    corroding put a bit of cardboard on so
  • 00:03:44
    we don't spray the
  • 00:03:50
    [Music]
  • 00:03:54
    house we'll let that dry then we'll give
  • 00:03:56
    it another like two coats then at the
  • 00:03:59
    very and we'll cable toe that tag on
  • 00:04:01
    which says this is important don't chop
  • 00:04:04
    it
  • 00:04:04
    [Music]
  • 00:04:16
    brother 32 mil
  • 00:04:19
    yeah I saw like a clip on Instagram
  • 00:04:22
    recently like it was an old business
  • 00:04:24
    businessman an old baller and he was giv
  • 00:04:27
    advice and he said um if you want
  • 00:04:30
    success in business you have to be there
  • 00:04:32
    like you have to be on
  • 00:04:34
    site so this is me being
  • 00:04:37
    here I could be sitting at home but it's
  • 00:04:41
    just better if you're on site with the
  • 00:04:42
    boys you know catch up with them make
  • 00:04:44
    sure everything's done as it should be
  • 00:04:47
    um get to actually like meet clients and
  • 00:04:49
    meet people and it's just always better
  • 00:04:51
    if you're not sitting at home this is it
  • 00:04:53
    mate and there's even a chair for
  • 00:04:58
    me
  • 00:05:04
    good day guys Ben from mwatts here um
  • 00:05:06
    we're just in abbotford this morning um
  • 00:05:09
    and we're just in wiring and installing
  • 00:05:11
    a heed Tower rail we will also add an
  • 00:05:14
    isolation switch that will control the
  • 00:05:17
    PowerPoint below which controls the
  • 00:05:19
    heated Tower rail you can pick one of
  • 00:05:21
    these up at your local Bunnings for
  • 00:05:22
    about $100 to $200 depending on the
  • 00:05:28
    Range
  • 00:05:29
    [Music]
  • 00:05:38
    [Music]
  • 00:05:55
    [Music]
  • 00:05:58
    oh
  • 00:06:00
    [Music]
  • 00:06:14
    I don't even I don't know either secret
  • 00:06:16
    to uh working with the first year
  • 00:06:19
    patience uh trust I guess I don't know
  • 00:06:24
    about TR right how you
  • 00:06:28
    going
  • 00:06:34
    Che
  • 00:06:38
    yeah what's this for oh
  • 00:06:44
    yeah yeah sweet that should be fine so
  • 00:06:48
    this is an overhead fuse box Mains
  • 00:06:51
    comeing from the street connecting to
  • 00:06:53
    this it has an 80 amp fuse in it 80 amp
  • 00:06:56
    fuse cables consumers mans out of this
  • 00:06:58
    down to the s board but there's like
  • 00:07:01
    multiple points of protection this is
  • 00:07:04
    the this is the first point of
  • 00:07:06
    protection so the power distributor boys
  • 00:07:08
    just popped in to disconnect the
  • 00:07:10
    overhead Supply that allows us to do
  • 00:07:13
    everything now set it all up fully they
  • 00:07:15
    just did it cuz I don't know they got a
  • 00:07:16
    quiet day or something usually they
  • 00:07:18
    don't come here until the truck
  • 00:07:19
    appointment in the afternoon but uh they
  • 00:07:22
    popped in disconnected that now we can
  • 00:07:24
    do everything that we need to do Simon
  • 00:07:26
    see this box up here you can disconnect
  • 00:07:28
    that
  • 00:07:30
    and then we'll be pulling the cables in
  • 00:07:33
    the roof in poking our new one through
  • 00:07:36
    the same
  • 00:07:36
    [Music]
  • 00:07:53
    hole so what we're doing in here is
  • 00:07:55
    stripping out the old meter pel cuz it's
  • 00:07:58
    all dead now
  • 00:07:59
    stripping that out but the new reg or
  • 00:08:02
    the current regulations is that it has
  • 00:08:04
    to be a hinged panel so that whole
  • 00:08:05
    Timber panel is going replaced with this
  • 00:08:08
    plastic hinged panel that meter panel is
  • 00:08:11
    going to sit there the switchboard's
  • 00:08:13
    staying as is we're just wiring a new
  • 00:08:15
    consumer Mains into the main switch only
  • 00:08:17
    when you um redo things so once like
  • 00:08:21
    everything's fine and safe as it is but
  • 00:08:24
    once you start rewiring Mains you've got
  • 00:08:26
    to bring everything up to the current
  • 00:08:28
    standards
  • 00:08:30
    even just leave it mate leave it leave
  • 00:08:32
    it leave it now we can undo those
  • 00:08:34
    Phillips head screws and the whole panel
  • 00:08:36
    will come
  • 00:08:37
    [Music]
  • 00:08:52
    off so Ben's a fourth year
  • 00:08:55
    Apprentice he actually started his
  • 00:08:58
    apprenticeship with us as a first last
  • 00:08:59
    year he was doing uh I hate to speak on
  • 00:09:01
    your behalf but he was doing University
  • 00:09:05
    teaching and uh decid you want to change
  • 00:09:08
    you were then working for like a floor
  • 00:09:09
    floor Lane company helping with their
  • 00:09:11
    deliveries and that how long did you do
  • 00:09:13
    that for uh probably nearly two years
  • 00:09:16
    two years doing that sent us an email it
  • 00:09:18
    just so happened at that time we were
  • 00:09:20
    looking for someone I think it was the
  • 00:09:22
    at the time it was me and Adrian so then
  • 00:09:24
    Ben came on as a first year started his
  • 00:09:26
    trade school at ni in
  • 00:09:28
    cartton and been with us ever since it
  • 00:09:31
    becomes qualified in October so it's uh
  • 00:09:34
    certainly the home the home Sprint found
  • 00:09:36
    it found it quick or
  • 00:09:38
    slow uh goes through waves I think I
  • 00:09:42
    think uh up till second year I think
  • 00:09:45
    first year went quick and then
  • 00:09:48
    yeah so when we're doing a job like this
  • 00:09:51
    it's like a half day job or a full day
  • 00:09:55
    job we're always um keeping everything
  • 00:09:58
    under control like we got our rub pile
  • 00:09:59
    there we got a pile of things that we're
  • 00:10:01
    done with that's ready to go back to the
  • 00:10:03
    van ladder's finished so now that's
  • 00:10:05
    ready to go back so we're always keeping
  • 00:10:06
    everything like simplified otherwise you
  • 00:10:09
    just got everywhere and it's easier
  • 00:10:11
    if the only things you've got out are
  • 00:10:13
    the things that you still need cuz then
  • 00:10:14
    it's just less things to trip over and
  • 00:10:17
    look at and whatever good day guys my
  • 00:10:19
    name is Simon um how I found my
  • 00:10:22
    apprenticeship with mwatts was through
  • 00:10:24
    Instagram uh I hit up cam he was looking
  • 00:10:27
    for a trial and then yeah I did it for
  • 00:10:30
    you know a few weeks and got a call from
  • 00:10:32
    cam afterwards asking you know when do
  • 00:10:34
    you want to start so yeah the rest is
  • 00:10:36
    history
  • 00:10:38
    [Music]
  • 00:10:55
    [Music]
  • 00:10:58
    mate
  • 00:11:01
    [Music]
  • 00:11:13
    you
الوسوم
  • electrical installation
  • meter panel
  • consumer mains
  • safety checks
  • apprenticeship
  • on-site work
  • heated towel rail
  • cable management
  • current regulations
  • organization